Temporary Power Poles
Overhead or underground temp poles with a meter base, main breaker and GFCI outlets. Each one sits outside the utility easement, ready for inspection. A licensed electrician builds and wires it.
Commercial Jobsite Power & Lighting
Construction temporary power and site lighting for commercial and industrial jobs across Greater Houston. We plan temp poles, generators and light towers with your site layout. A TDLR-licensed contractor makes every electrical connection.

Service Overview
A Houston jobsite with no power loses the first week. Crews wait on a temp pole, a permit release and a CenterPoint meter while the trailers sit dark. Construction temporary power closes that gap. Jimenes Construction plans and manages it, and a TDLR-licensed electrical contractor builds and connects every pole and panel.
The work covers temp poles and panels for trailers and tools, plus spider boxes that split power out to the trades. Generators fill in where the utility is not ready. Light towers and string lighting cover night work and security. We plan where each one goes. In Texas, only a TDLR-licensed electrical contractor may build and wire a temp pole. That licensed contractor builds and energizes every pole, panel and connection. We run the site work around it and hold the schedule, the same way we do on jobsite support.
In Houston, a master electrician registered with the City pulls the permit for a temp pole. The City issues a temporary saw pole permit or a temporary cut-in permit. Both need a passed inspection. CenterPoint then assigns an ESI ID, and your retail electric provider orders the meter. No permit release, no meter. In unincorporated Harris County, the County Engineer sends the power release to CenterPoint. Other cities and counties run their own steps. Your utility depends on the address: most Houston sites are CenterPoint, while Conroe and parts of The Woodlands are Entergy Texas.
We pick the pole spot with the laydown yard and the access road in mind, so it does not get moved twice. We dig the underground temp feed trench with the rest of the underground utility work. The electrician pulls the conductors, then we backfill and mark the route. Generators sit on level gravel pads, and cords stay out of the traffic lane.
Coverage
We plan and coordinate all six. The electrical work is done by a TDLR-licensed partner.
Overhead or underground temp poles with a meter base, main breaker and GFCI outlets. Each one sits outside the utility easement, ready for inspection. A licensed electrician builds and wires it.
Panels and spider boxes that carry power from the pole to each floor and trade. The licensed electrician puts them in and keeps light and outlet circuits apart.
Power planned for job trailers, site offices and tool cribs, then connected by the licensed electrician. The office has lights and air on day one.
Towable light towers placed for night work, excavation and security, aimed to meet OSHA minimum foot-candles.
Generators sized to the load and parked on a level pad, with a refuel schedule so power never runs dry overnight.
Temporary string lighting run by the licensed electrician through stairwells, corridors and interiors. Exits and walkways stay lit as the building closes in.
Our Process
Five steps, the same on a light-tower drop and on a multi-trailer site. Call (832) 576-3278 to start at step one.
We walk the site plan and list trailers, tools, cranes and pumps, plus the areas that need light. Then we mark the pole, panel, generator and tower spots away from traffic and excavation.
A master electrician registered with the City pulls the temp pole permit. In unincorporated Harris County, the County Engineer sends the power release. We track the CenterPoint request and check if the site is on CenterPoint or Entergy Texas.
The licensed electrical contractor builds, wires and connects the pole and panel. Our crew trenches and backfills the underground feed, preps the generator pad, and keeps cords out of the traffic lane.
The city inspection is passed and the release goes to CenterPoint. Your retail electric provider orders the meter, CenterPoint sets it, and the electrician tests every GFCI before crews plug in. Generators bridge the gap if the meter runs late.
Light towers are placed and aimed, fuel runs are scheduled, and cords are checked through the job. When permanent power is live, the electrician removes the temp wiring and we pull the rest. NEC Article 590 requires removal at completion.
Timeline
Planning ranges, from request to power. CenterPoint and city schedules set most of it.
| Project Type | Typical Size | Duration |
|---|---|---|
| Light tower or generator drop-off | 1 - 4 units | Same Week |
| Temp pole near existing CenterPoint service | 1 pole, 100 - 200 A | 1 - 3 Weeks |
| Temp pole needing a CenterPoint line extension | 1 pole | Set by CenterPoint |
| Multi-trailer site with spider box distribution | Trailers plus 2 - 4 floors | 2 - 4 Weeks |
| Plant turnaround or night-work lighting package | Varies by scope | Planned to the outage window |
Engineering & Compliance
Temp power on a Houston site answers to the NEC, OSHA and the utility at the same time. Here is what that means on the ground.
Why Jimenes
Temp poles often land in the wrong spot and get moved twice. We plan pole and panel spots with the laydown yard, the trenches and the access road on one plan.
A pole with no permit release never gets a meter. We track the inspection, the release and the CenterPoint ESI ID until the meter is set.
In Texas, only a TDLR-licensed electrical contractor may wire a temp pole. That work goes to a licensed contractor, and the proposal shows their license and their line item.
Hurricane Beryl left about 2.2 million CenterPoint customers without power in July 2024. We plan fuel, generator backup and tower tie-downs before June 1.
Credentials
Texas licenses electrical contractors, not site-work firms. The electrical work on your site is done under a licensed contractor's TECL number. Our insurance papers come with every proposal.
Where We Work
We plan temporary power and lighting for jobsites across Greater Houston. Most sites here sit in CenterPoint territory. Conroe and parts of The Woodlands are served by Entergy Texas, and we plan for either. If you searched for temporary power in Houston and landed here, this is the radius we cover.
Good Questions
Still sorting out power for your site? Call and talk to the superintendent who will plan it.
Talk to a BuilderIn Texas, only a TDLR-licensed electrical contractor may build and wire a temp pole. In Houston, the permit for that pole is pulled by a master electrician registered with the City. Jimenes plans and manages the power on your site, and a licensed electrical contractor builds, wires and energizes every pole and panel. We handle the trenching, pads and layout around it and keep the schedule.
Yes. The City of Houston issues a temporary saw pole permit or a temporary cut-in permit, and both need a passed inspection. The permit is valid for 180 days. In unincorporated Harris County, the County Engineer issues a power release instead. CenterPoint will not set a meter until that release is in hand. Getting the ground ready is part of our site preparation work.
It depends on the permit, the inspection and whether CenterPoint has to extend a line to your site. CenterPoint assigns an ESI ID, then your retail electric provider orders the meter. Conroe and parts of The Woodlands are Entergy Texas instead. Generators bridge the gap if the meter runs late. A temp pole can stay up for the length of construction under NEC Article 590, and it comes out when the job is done.
Houston inspects to the 2023 National Electrical Code, and Article 590 governs temporary installations. In plain terms, a temp pole needs a meter base, a main disconnect, GFCI protection on the receptacles and proper grounding. It has to sit where CenterPoint's service standards allow, outside the utility easement. Pole depth and the number of ground rods follow the utility spec and the electrician's design, so they vary from site to site. We dig and backfill the trench for an underground feed. Our trench safety and shoring page covers how we keep that trench safe.
OSHA sets minimum light levels in 1926.56, Table D-3. General construction areas need 5 foot-candles. Excavation, accessways and refueling areas need 3. Shops and electrical rooms need 10, and site offices and first aid stations need 30. We place and aim towers to hit these levels, with more light for night work and detailed tasks. Night work on our concrete slabs jobs gets the same lighting plan.
It depends on the job. A temp pole makes sense when the work runs long and the utility line is close. A generator fits a remote or early site, the gap before the meter is set, and storm backup. Many Houston sites use both. Cost is driven by any line extension, the distance, the load, fuel and how long you need power. We also plan an entrance that fuel trucks can use after rain.