Concrete Foundations & Post-Tension Slabs
Post-tension slabs and drilled piers designed from a geotech report for Missouri City's Lake Charles clay.
Learn MoreServing Missouri City & Fort Bend County
Self-performed concrete, foundation repair and drainage for Missouri City's flat Lake Charles clay lots, from Quail Valley to Sienna.

Missouri City, Texas
Missouri City is zoned, which surprises people who moved over from Houston. There is a zoning ordinance, a Zoning Board of Adjustment and published Architectural Design Standards. Permits split in two. Inside the city limits they come from Development Services at 1522 Texas Parkway. In the unincorporated ETJ they come from Fort Bend County Engineering in Richmond. Sienna is split. The city annexed the Sienna MUD No. 2 area on August 21, 2023, so which office issues your permit depends on which side of that line your lot sits. We check before we price.
Much of the older city sits on Lake Charles clay, rated very high for shrink-swell. It swells when it rains and shrinks in drought, and that yearly movement is what cracks slabs and drops beams. Sienna is trickier: the Brazos floodplain soils change lot to lot, from Norwood loam, which swells less, to Brazoria clay that is some of the most expansive in the county survey. You cannot eyeball it. We design every slab, post-tension or drilled pier, from a geotech report for that lot.
Then there is the water. The surprise is how flat your lot is. The soils across Missouri City are mapped at zero to one percent slope, so rain has nowhere to run. The city's own advice is to grade soil away from the house and keep the swales between lots clear. Drainage upkeep is shared by the city, local MUDs and county drainage districts. In Sienna, the levee district added pumps, storage and flood gates after Harvey. Putting fill in the floodplain needs a permit with an engineer-sealed grading plan. Our crews are self-performed and roll out of north Houston, about 40 to 45 minutes off-peak.
Service Area
We do not have an office in Missouri City. The crews and trucks leave from our north Houston yard, run down the Hardy Toll Road, I-610 and US 90A, and are on your lot in about 40 to 45 minutes off-peak. Allow closer to an hour for Sienna.
Services In This Area
Every service below is available across Missouri City and Sienna, from Quail Valley to Riverstone.
Each links to its full service page.

Post-tension slabs and drilled piers designed from a geotech report for Missouri City's Lake Charles clay.
Learn More
Piers and releveling for 1970s Quail Valley and Fondren Park slabs that have spent decades on shrink-swell clay.
Learn More
Regrading and French drains for flat, zero-to-one-percent lots where rain has nowhere to run, tied into your MUD or levee district.
Learn More
New and replacement driveways poured to code. The city needs a permit and inspections even for a replacement, and we handle it.
Learn More
Building pads and floodplain fill built with the engineer-sealed grading plan and Development Permit that Sienna and the ETJ require.
Learn MoreOn The Ground
If your lot is near any of these, you are inside our same-week radius.
Subdivisions & Neighborhoods
Zip Codes
Local Conditions
The three things that change a Missouri City bid before we have drawn a single line.
A zoned city, with two permit offices.
Very high shrink-swell clay that varies by lot.
Flat ground, with the Brazos next door.
Good Questions
Straight answers about permits, clay and drainage in Missouri City. Call and talk to an actual builder, not a call center.
Talk to a BuilderYes. The city says a new concrete slab and a driveway repair or replacement both still need a permit and inspections. Work at the street needs a Right-of-Way Use Permit, and contractors must be registered with the city before they start. We pull the permit at 1522 Texas Parkway and book the inspections through the MCTX Self Service portal.
It depends on your lot. The former Sienna MUD No. 2 was annexed on August 21, 2023, so those homes now get city permits. The parts still in the ETJ go to Fort Bend County Engineering in Richmond, which wants a Residential Development Permit for any structure of 400 square feet or more. We check which one applies before we price.
Much of the older city sits on Lake Charles clay, rated very high for shrink-swell. It swells in the rain and shrinks in drought, and that movement cracks slabs. In Sienna the Brazos soils swing from loam that swells less to very expansive clay. The fix is a geotech report first, then a post-tension slab or piers designed to it.
Usually it is not sloped at all. The soils here are mapped at zero to one percent slope, so water sits. The city tells owners to grade soil away from the house and keep the swales between lots clear. Drainage upkeep is shared by the city, your MUD and the county drainage district.
Only with a floodplain Development Permit and a grading plan signed and sealed by a professional engineer. Putting fill in the Special Flood Hazard Area needs a local permit too. If the work costs more than half the market value of the building, the building must meet the floodplain rules. Usually that means raising it above the flood level.
Yes. There is a zoning ordinance, a Zoning Board of Adjustment and published Architectural Design Standards. Newly annexed land comes in as suburban district until council gives it permanent zoning. Check the zoning before you plan a shop building or a commercial use, because it can rule the use out.
Built On Integrity. Focused On You
Free estimates, straight timelines, and a crew that treats your job like their own.