Equipment Pads & Machine Foundations
Pads and machine foundations for Ship Channel and Bayport plants, sized off the geotech report on Lake Charles clay.
Learn MoreHarris County · 35 Min From Our Yard
Concrete, steel and site work for Ship Channel plants and postwar homes, self-performed by our own crews.

Pasadena, Texas
Pasadena has no zoning. What limits your lot instead is the city code and whatever deed restrictions were written into your subdivision. The city will not keep or interpret those restrictions, so we pull them from the Harris County Clerk before we draw anything. Permits come from the Permit Department at City Hall, 1149 Ellsworth, and the city moved to its 2024 codes on February 2, 2026. One more split matters here. Plants in the ETJ industrial districts are not under city ordinances or city permits. That work runs on the plant's own standards, plus any county or state permits that apply.
Soil maps across Pasadena show Lake Charles and Bernard clay on the Beaumont Formation. Lake Charles is a Vertisol, which means it cracks open and closes again every year. That annual movement is what drops beams and cracks postwar slabs, and it is why an equipment pad or machine foundation on the plant side gets designed off the geotech report, not a rule of thumb. Pasadena also sat over one of the worst subsidence zones in the region. More than 10 feet of sinking was measured near here between 1906 and 1995, and it largely stopped only after the late-1970s switch to Lake Livingston surface water.
Then there is the water. About 4,610 Pasadena houses flooded in Hurricane Harvey, and Vince and Little Vince Bayous both set record levels. So the city floodplain permit is strict: engineer-sealed plans, Atlas 14 drainage math, a detention design and a SWPPP, all filed with the building permit or the building permit is rejected. As a concrete contractor working across Pasadena, we bid the detention and the elevation up front, and if your address is east of SH-146 we flag the windstorm certificate before it holds up the job.
Service Area
We are not a call center routing your job to whoever is free. The crews and trucks leave from our north Houston yard and reach Pasadena in about 35 to 40 minutes off-peak, down I-610 and SH-225.
Services In This Area
Every service below runs from the Ship Channel plants to the postwar subdivisions.
Each links to its full service page.

Pads and machine foundations for Ship Channel and Bayport plants, sized off the geotech report on Lake Charles clay.
Learn More
Structural steel pipe racks and supports for petrochemical work, built to your plant's own standards in the ETJ districts.
Learn More
Field repairs and steel changes after wind, corrosion or the 2023 EF3 tornado that hit northwest Pasadena.
Learn More
Piers and releveling for postwar Pasadena slabs cracked by Vertisol clay that opens and closes every year.
Learn More
Detention and storm sewer sized to Atlas 14, the way the city floodplain permit requires near Vince Bayou.
Learn MoreOn The Ground
If your lot is near any of these, you are inside our same-week radius.
Subdivisions & Neighborhoods
Zip Codes
Local Conditions
The three things that change a Pasadena bid before we have drawn a single line.
City of Pasadena, and no zoning.
Expansive clay in a long-sunken area.
Where the water goes, and what the wind can do.
Good Questions
Six things Pasadena owners ask before they hire a contractor. Call and talk to an actual builder if yours is not here.
Talk to a BuilderMost work does. The Permit Department is on the first floor of City Hall at 1149 Ellsworth Dr., open 8 to 5, and no permits are issued after 4:30 p.m. The city moved to its 2024 codes on February 2, 2026. Plants in the ETJ industrial districts are not under city ordinances or permits. Those jobs run on the owner's approvals and any county or state permits that apply.
City code plus your deed restrictions. The city does not keep or interpret deed restrictions, so you pull them from the Harris County Clerk. Setbacks run 25 ft in front and at least 5 ft on the sides, and building across a lot line needs a replat first. We read all of that before we draw anything.
Both bayous set record levels in Harvey, and about 4,610 Pasadena houses flooded. A Floodplain Development Permit needs engineer-sealed plans, Atlas 14 drainage calculations, a detention design with cut and fill numbers, and a SWPPP. It has to go in with the building permit, or the building permit is rejected.
The ground. Lake Charles and Bernard clays on the Beaumont Formation are expansive, and Lake Charles is a Vertisol whose cracks open and close every year. On top of that, more than 10 feet of subsidence was measured near Pasadena between 1906 and 1995. With about 58% of homes built before 1980, a lot of postwar slabs have already moved.
Plants set their own site rules and usually require contractor safety prequalification before anyone comes on site. Plants in Pasadena's ETJ industrial districts are not under city ordinances or permits. The plant's standards govern the work, along with any county or state permits that apply. Ask us about your site's requirements and we will tell you honestly what we can take on.
Only if your property is east of State Highway 146, the part of Pasadena inside the state windstorm inspection area, where a WPI-8 certificate applies. West of there, wind design follows the adopted 2024 code. Either way, the 2015 and 2023 tornadoes are a good reason to check the anchorage on a metal building.