
Site Work & Building Pads
Engineered pads and cut-and-fill on flat, slow-draining Clodine and Cyfair ground, permitted with the county.
Learn MoreNorthwest Harris County · 35 Minutes From Our Yard
Concrete, steel and site work for Cypress, TX, built for flat prairie ground, county floodplain rules and the acreage out US 290 toward Hockley.

Cypress, Texas
Cypress is not a city. It is an unincorporated community in northwest Harris County, sitting inside Houston's extraterritorial jurisdiction, so there is no city hall and no city code. Every lot here permits through Harris County OCE Permits at 1111 Fannin St. The county is blunt about it: a permit is needed for all development, and that wording covers filling, grading, paving and excavation, not just buildings. As a general contractor in Cypress, TX, the first thing we do is line up the county permit for the dirt work, because the site work needs one too.
Most of Cypress sits on Lissie Formation loam, not the highly expansive Beaumont clay people expect near Houston. The named soils here, Clodine and Cyfair, are loamy and low to moderate in shrink-swell. The catch is that this ground is nearly dead flat, on slopes under one percent, and slow to drain. There is one more thing Cypress owners should know about. The Hockley Fault crosses US 290 near the outlet mall, mapped in a 2018 peer-reviewed study that recorded pavement cracks along its trace. In places the deep Cyfair subsoil reaches about 45 percent clay, so on acreage near 290 we check the fault maps and pull a geotech report before a slab goes down.
Then there is the water. In a storm somewhere between a 5-year and a 10-year event, Cypress Creek starts to overflow and sheet-flow into the Addicks Reservoir watershed. In Harvey the creek topped 500-year levels from Barker Cypress Road down to Aldine Westfield. The county writes strict rules because of it. On lots outside newer county-standard subdivisions, finished floors sit at least 12 inches above grade or the street crown, whichever is higher. Inside the floodplain they go higher, and fill in the 500-year floodplain needs one-to-one mitigation in the same watershed. Most homes here went up between the 1990s and the 2010s, from Bridgeland and Towne Lake to the prairie acreage toward Hockley. Our crews are self-performed and our yard is about 35 minutes east, so we are on your Cypress lot the same week you call.
Service Area
We are not a call center routing your job to whoever is free. The crews and trucks leave from our north Houston yard and are in Cypress in about 35 minutes off-peak, west on Beltway 8 and out US 290.
Services In This Area
Every service below is available across Cypress, from Bridgeland to the Hockley acreage.
Each links to its full service page.

Engineered pads and cut-and-fill on flat, slow-draining Clodine and Cyfair ground, permitted with the county.
Learn More
Ponds and French drains sized to county roadside-ditch rates, where Cypress Creek overflows toward Addicks.
Learn More
Slab-on-grade shops and barndominiums for the prairie acreage out US 290 toward Hockley.
Learn More
Slabs and drilled piers set to floodplain heights, with a geotech report where the Cyfair subsoil turns clay.
Learn More
Concrete driveways and county-spec culverts in 18-inch reinforced pipe where your lot fronts a roadside ditch.
Learn MoreOn The Ground
If your lot is near any of these, you are inside our same-week radius.
Subdivisions & Neighborhoods
Zip Codes
Local Conditions
The three things that change a Cypress bid before we have drawn a single line.
No city hall. The county permits all development.
Flat prairie loam, and a fault under US 290.
Cypress Creek fills fast, so the rules are strict.
Good Questions
Straight answers to what Cypress owners ask before they build. Call and talk to an actual builder, not a call center.
Talk to a BuilderYes. Cypress is unincorporated, so there is no city permit office. Harris County OCE Permits at 1111 Fannin St issues them, and the county says a permit is needed for all development. That wording includes filling, grading, paving and excavation, so the site work needs one too, not just the building.
It depends on the lot. Outside the 100-year floodplain, if your lot is not in a subdivision built to the county's newer standards, a new home's finished floor sits at least 12 inches above the highest adjacent grade, measured 10 feet out, or 12 inches above the street crown, whichever is higher. In the 500-year floodplain it must be at or above the 500-year level. In the 100-year floodplain the floor goes 24 inches above the 500-year elevation, or 12 inches above the street crown if that is higher. We build the pad to hit those numbers.
Not freely. Any fill in the 500-year floodplain has to be offset one-to-one with equal storage dug out elsewhere in the same watershed. Outside the floodplain, fill still needs a county development permit. We plan the cut and fill so the volumes balance before we haul anything in.
Yes, from the County Engineer, if the driveway or culvert sits in a county right-of-way or easement. Building one without a permit is prohibited. The pipe has to be reinforced concrete, 18 inches minimum, and we install it to that spec so it passes inspection.
Mostly no. Cypress sits on the Lissie Formation, and the soils are loamy, like Clodine and Cyfair, with low to moderate shrink-swell. But the ground is flat and slow to drain, and the Cyfair subsoil still reaches about 45 percent clay. The Hockley Fault also crosses US 290 here, so on acreage near 290 we check the fault maps and pull a geotech report. If the Cyfair clay subsoil has already cracked an older slab, we handle the foundation repair in Cypress too.
One single-family home with no major change in drainage usually does not. Commercial sites usually do: about 1.0 acre-foot per acre for a roadside-ditch outfall, and 0.75 for a storm sewer, under the county's infrastructure rules, last updated in 2023. Cypress Creek starts to overflow toward Addicks in a 5- to 10-year storm, which is why the county is strict here.
Built On Integrity. Focused On You
Free estimates, straight timelines, and a crew that treats your job like their own.
