Parking Lots & Drive Lanes
Full concrete lots and drive lanes for retail, office, medical and multifamily sites, jointed and doweled to carry daily traffic without corner breaks.
Commercial & Residential Concrete
Concrete parking lots, drive lanes, fire lanes and aprons for Houston businesses. Formed, jointed and poured by our own crews, and built to hold loaded trucks on expansive clay.

Service Overview
A cracked, sunken parking lot costs you every day. On Houston's expansive clay a thin slab pumps and heaves with every wet and dry cycle. Corners break off where loaded trucks turn. Water ponds in the low spots after a 52-inch rain year. A concrete lot poured and jointed right holds that traffic for decades. Jimenes Construction is a self-performing concrete contractor with 23 years of Houston flatwork. Our own crews handle the subgrade, forming, steel, load-transfer joints and finish, engineered for clay from the base up.
We pour the whole lot: drive lanes, fire lanes, truck aprons, the striped stalls and the ADA parking and access aisles the inspector will count. There is no brokered paving sub in the middle, so the grade and the joints line up on every pour.
The details around the slab matter as much as the slab. We tie in curbs and gutters, set wheel stops, and build the trench and slot drains that move water off the lot and into detention. Every lot is priced line by line and built to City of Houston paving standards.
Coverage
Each of these is its own trade. We crew, form and pour all six in house.
Full concrete lots and drive lanes for retail, office, medical and multifamily sites, jointed and doweled to carry daily traffic without corner breaks.
Heavy-duty aprons and fire lanes at 6 to 8 inches, poured to hold loaded fire apparatus and delivery trucks where asphalt ruts and shoves.
Accessible stalls, van spaces, access aisles and curb ramps built to the stall counts and slope limits the plan review and inspector require.
Cast-in-place curb and gutter, ribbon curb, landscape islands and header curbs that hold the pavement edge and steer runoff.
Graded flumes, valley gutters, trench and slot drains, and paving tied to on-site detention so a Houston downpour leaves the lot.
Loading dock aprons, dumpster pads and equipment pads with thickened edges and anchor bolts set to the site and steel drawings.
Our Process
Five steps, the same on a small retail lot and on a truck yard. Call (832) 576-3278 to start at step one.
We walk the site and read the soil report and the civil plans. Then we check truck access, drainage and how heavy the traffic will run before we price the pour.
A line-item quote tied to the plan: slab thickness, psi, dowel and joint layout, subgrade treatment, curb and drain footage, and ADA stall counts.
Permit pulled with the City of Houston or Harris County. Then subgrade cut, lime or select fill placed and proof-rolled, and forms set to grade.
Rebar or dowels chaired, slopes checked to the drainage plan, and the pre-pour inspection cleared before the first truck backs in.
Concrete placed and finished, control joints sawn on time, cure applied, then curbs, wheel stops and striping laid out to the ADA plan at closeout.
Timeline
Real ranges from our own job records, from mobilization to the last stripe.
| Project Type | Typical Size | Duration |
|---|---|---|
| Dock apron, dumpster or equipment pad | 500 - 2,000 sq ft | 1 - 2 Weeks |
| Small retail or office lot | 5,000 - 15,000 sq ft | 2 - 4 Weeks |
| Full commercial parking lot | 20,000 - 60,000 sq ft | 4 - 8 Weeks |
| Truck yard or industrial paving | 60,000+ sq ft | 8 - 14 Weeks |
| Tear-out and repave of an existing lot | 10,000 - 40,000 sq ft | 3 - 7 Weeks |
Engineering & Compliance
A parking lot lives or dies on the subgrade and the joints. We build both to the soil report for your site.
Why Jimenes
Most paving jobs get split between a dirt sub, a concrete sub and a stripe sub. Our own crew preps the subgrade, forms, pours and finishes, so the grade and the joints line up.
Asphalt softens, ruts and shoves in Houston summers, and loaded trucks tear it apart. A jointed concrete lot carries the same traffic for decades with far less patching.
Subgrade density, dowel spacing, slopes and ADA stall layout get checked before we pour. Problems get fixed in the forms, while a fix still takes an hour.
Slab, subgrade, curb, drainage and striping each get their own line. You see what drives the number, and change orders are signed before the work.
Credentials
Texas does not license concrete contractors, so we send the insurance certificate and the inspection records with every proposal. Here is what a commercial paving contractor in Houston can actually show you.
Where We Work
Headquartered in Houston and pouring commercial concrete across the Greater Houston area, from inside the 610 Loop out past the 180-mile Grand Parkway. If you searched for a commercial paving contractor near me and landed here, this is the radius we cover. We can be on site the same week.
Good Questions
Still not sure? Call and talk to the person who will run your paving job.
Talk to a BuilderFor a commercial lot in Houston heat, concrete usually wins on the long run. Asphalt is cheaper to install, but it softens, ruts and shoves in the summer. Loaded trucks tear up the drive lanes and aprons fastest. Concrete costs more up front and lasts far longer with less patching. Many owners pour concrete only in the heavy-wear zones and keep asphalt in the light-parking bays. We build the concrete side: drive lanes, fire lanes and dock aprons, and full lots.
There is no flat rate, because two lots the same size can price very differently. The concrete parking lot cost is driven by a few things:
The count comes off the total number of stalls, and at least one accessible space has to be van-accessible. As a rule, small lots need one accessible stall for the first 25 spaces, and the number climbs from there. Each accessible stall needs a striped access aisle, a curb ramp and slopes inside the ADA limits. We lay out the stalls, aisles and ADA ramps and walkways to the plan so it passes inspection. Send us the site plan and we will confirm the count for your lot.
Two things: the subgrade and the joints. Houston clay swells and shrinks with the weather, so we treat or replace weak subgrade and compact it before we pour. Then we saw control joints early and set doweled joints at the edges to transfer the load from loaded trucks. For water, we grade the whole lot to the drainage plan. Then we tie in curbs and gutters and trench and slot drains so a heavy rain runs off the lot in minutes.
Yes, on almost any commercial paving job. Inside city limits the permit and plan review come from the City of Houston. The paving has to meet the Infrastructure Design Manual standards. Outside city limits it runs through Harris County Engineering, and the surrounding counties each have their own office. Fire lanes, detention and ADA stalls all get reviewed. On a lot in the Harris County floodplain, detention and fill rules weigh in, and a licensed engineer signs the drainage plan. We pull the permit and book every inspection.
Usually, yes. We phase the pour so part of the lot, the entrances and the fire lanes stay open while we work the rest. We stage the tear-out, subgrade and pour section by section, and time the closures around your busy hours. Concrete needs to reach strength before traffic returns, so each phase is dated in the schedule. If a section carries loaded trucks or the loading dock, we plan that first. Call (832) 576-3278 and we will walk the phasing with you.